The city of San Jacinto is widening the Ramona Expressway over about a 10-month period beginning Monday, Aug. 11, from the two existing lanes to five lanes.

Sean Motlagh, project manager in the City Engineering Department, said the project will modify traffic signals, improve drainage and add a bike path, too. The project is between Eagle Road and Lake Park Avenue/Main Street in San Jacinto, and will cost $3.9 million to build with a final cost of $5.2 million that includes plans and engineering costs.

Motlagh said though traffic will not be blocked, commuters from Idyllwild “may want to use alternative routes.” The project is expected to end in June 2015.

 

Similar Posts

  • Anza man guilty of infanticide

    Dannie Joe Farnum, 30, of Anza was found guilty of second degree murder. Farnum was arrested and accused of killing the infant son of his girlfriend, Delice Sharon Preston, in November 2008. Farnum was watching the infant while Preston went shopping. During this time, he apparently dropped or beat the child. When Preston returned, Farnum…

  • Riverside County plans new medical dispatch system

    A new dispatch system for emergency medical calls is on the horizon in Riverside County. At a workshop last week, the Board of Supervisors listened to staff and the public discuss changes needed to implement the new system. “We are interested in becoming the system that’s the model,” said County Emergency Services Director Bruce Barton….

  • Groundwater management bills signed

    Last week, Gov. Edmund Brown Jr. signed legislation to strengthen protections of groundwater use in California. The three bills establish a framework for local groundwater management and set timetables to begin implementation. Emphasis will be placed on groundwater basins, which are high or medium priority. Each water basin’s priority must be identified by Jan. 31,…

  • Measure U: HUSD funding

    The Hemet Unified School District is requesting reauthorization of $49 million worth of borrowing power. Measure U, on the November ballot, would allow the district to borrow the funds at a lower rate than the current bonding authorizations provide, thus saving money. In 2006, district voters approved Measure T, which authorized $149 million of borrowing….

  • Being ready — wildfire preparedness

    By Cal Fire Contributed Being ready for wildfire starts with maintaining an adequate defensible space and by hardening your home by using fire-resistant building materials. Defensible space is the buffer you create by removing dead plants, grass and weeds. This buffer helps to keep the fire away from your home. Hardening your home means using construction…

  • Composting needs volunteers

    The Riverside County Waste Management Department is seeking volunteers to work with the Riverside County Backyard Composting Program. Volunteer master composters attend a training course for four Saturdays, and then donate back a minimum of 40 hours to the program. Volunteers are needed for staffing Saturday morning workshops, classroom presentations and community group presentations. Learn…